Steel Industrial Halls – BWB Steel

Light industrial
and storage halls

Light steel frame structures (LGS, LSF) for commercial applications — steel halls meeting the highest quality standards.

Built entirely from light steel profiles or as hybrid solutions combining LGS with hot-rolled steel.

Hala stalowa BWB Steel
hybrid constr.
LGS + hot-rolled
easy assembly
Low cost
EU standards
Full compliance
What is

Steel halls
in LGS and
hybrid technology

Light steel frame structures (LGS, LSF) offered by BWB STEEL are widely used in commercial construction, including the construction of steel halls. This technology provides full flexibility in design and the choice of finishing materials.

Halls can be built entirely from light steel profiles, enabling fast and efficient construction, or as hybrid solutions combining light steel with hot-rolled steel elements. Such structures are not only durable but also lightweight — facilitating assembly and transport while lowering investment costs.

BWB STEEL provides comprehensive project delivery, including construction and executive design, in compliance with applicable technical regulations and European standards.

BWB Steel Project
Lekka hala magazynowa BWB Steel
Benefits

Advantages of steel
frame construction

LGS frame construction offers measurable benefits over traditional building methods — from weight, through construction pace, to finishing flexibility.

01

Lower wall weight

A light steel profile structure puts significantly less load on the foundation and ground, reducing earthworks costs.

02

Fast construction pace

Factory prefabrication and profile precision can reduce on-site assembly time several times over.

03

No seasonal limitations

Installation possible all year round — no winter breaks, no wet work, no technological windows.

04

Slim wall section

A slimmer wall means extra usable floor area — particularly important for commercial and residential buildings.

05

Standards met

Fire resistance up to REI 120, acoustic and thermal insulation in accordance with current standards and regulations.

How we work

Cooperation process

The first step is design, allowing project feasibility to be assessed at an early stage. The next phase is production of light steel elements at our facility, followed by delivery and assembly.

01 — Stage

Design

  • Comprehensive software for designing buildings in light steel construction (LGS) technology.
  • The designer creates structural frames based on a new or client-supplied design.
  • A wide selection of libraries and stud spacing adjusted to the chosen cladding materials.
02 — Stage

Production

  • Our machinery park enables production of light steel construction up to 1.6 mm thick, cold-formed.
  • Precise, fast and reliable delivery: single- and multi-family buildings, commercial facilities, modular structures, halls and curtain walls.
03 — Stage

Assembly

  • Option 1: ready-made steel frames with studs, jambs, lintels and sills assembled in the factory — saves time and labour on site.
  • Option 2: unassembled steel profiles in packages with all fasteners. Each profile carefully labelled and numbered.
Other services

See our other
services

All BWB Steel solutions are based on LGS light steel profile technology — from walls, through floors, to complete buildings.

Steel Construction

Get in
touch

Get a free quote by filling in the contact form. Our team will get back to you within 24 hours.

Address BWB STEEL – design office
Lubelska 2A/45, 08-400 Garwolin
NIP 5252996697
Formularz
Get a Free Quote